Abstract. In construction management, the task of planning project schedules with consideration of labor utilization is very crucial. However, the commonly used critical path method (CPM) does not inherently take into account this issue. Consequently, the labor utilization of the project schedule derived from the CPM method often has substantial low ebbs and high peaks. This research proposes a model to obtain project schedule with the least fluctuation in labor demand while still satisfying the project deadline and maintain the project cost. The Differential Evolution (DE), a fast and efficient metaheuristic, is employed to search for the most desirable solution of project execution among numerous combinations of activities’ crewsizes and start times. Furthermore, seven DE’s mutation strategies have also been employed for solving the optimization at hand. Experiment results point out that the Target-to-Best 1 and a new hybrid mutation strategy can attain the best solution of project schedule with the least fluctuation in labor demand. Accordingly, the proposed framework can be an effective tool to assist decision-makers in the project planning phase.
Related article